Jack’s Construction Blog: WipeOut Pile Driving

Jack stops by Ocean Oasis Waterpark + Beachclub to see the status of WipeOut. In Episode 3, Jack visits Billy Walters as he works with his team to drive the deep piles for the foundations that will support the WipeOut Racer Slide.

http://youtu.be/0DXsDMiSS8E

Comments

Sandman says:

March 2, 2012 at 10:34 pm

Jack, can you explain this process a bit?  You drive the pilings down to the beach level and then countersink them a bit.  Do you then use the pilings as footings to attach the slide supports?

Speak Your Mind